Condensate polishing cost reduction at Peach Bottom Atomic Power Station
Technical Report
·
OSTI ID:437481
- Peco Energy Company, Delta, PA (United States)
In May 1995, PECO Nuclear began an investment of over 3 million dollars for improvements in the condensate polishers at Peach Bottom Unit 3. Based on current performance, the investment is expected to be returned by the first quarter of 1997. The centerpiece of the improvements is the backfit of pleat filters on most of the vessels. Manual isolation valves and new precoating equipment will assure sustained performance. This report summarizes the improved performance and the new equipment and methods used to achieve it.
- Research Organization:
- Electric Power Research Inst. (EPRI), Palo Alto, CA (United States); Williams (Paul) and Associates, Medina, OH (United States)
- OSTI ID:
- 437481
- Report Number(s):
- EPRI-TR-106929; CONF-960783-; TRN: 97:000678-0017
- Resource Relation:
- Conference: International low-level-waste conference, New Orleans, LA (United States), 22-24 Jul 1996; Other Information: PBD: Oct 1996; Related Information: Is Part Of Proceedings: 1996 EPRI international low level waste conference; PB: 715 p.
- Country of Publication:
- United States
- Language:
- English
Similar Records
A test program for predicting and monitoring the emergency diesel generator heat exchangers at Limerick Generating Station and Peach Bottom Atomic Power Station
Peach Bottom Atomic Power Station recirc pipe dose rates with zinc injection and condenser replacement
Feedwater heater life optimization at Peach Bottom Atomic Power Station
Conference
·
Sun Dec 31 00:00:00 EST 1995
·
OSTI ID:437481
+1 more
Peach Bottom Atomic Power Station recirc pipe dose rates with zinc injection and condenser replacement
Technical Report
·
Wed Mar 01 00:00:00 EST 1995
·
OSTI ID:437481
Feedwater heater life optimization at Peach Bottom Atomic Power Station
Technical Report
·
Fri Dec 01 00:00:00 EST 1995
·
OSTI ID:437481