Title: Methodology to determine transmission reserve import margin (TRIM)

Conference ·
OSTI ID:376192
; ; ;  [1]
  1. Commonwealth Edison Co., Chicago, IL (United States). System Planning Dept.

Transmission Reserve Import Margin (TRIM) is the minimum import transfer capability that must be reserved as a firm (non-recallable) committed use to supply native load during periods of generation deficiency at the planned level of reliability. The Federal Energy Regulatory Commission (FERC), in Docket No. RM95-8-000 (Mega NOPR) defines Available Transfer Capability (ATC) as ATC is capacity that must be made available for new firm transmission service requests. Basically, it is the capacity not committed to other firm uses during the scheduling interval(s) for which service is requested. The tariff must clearly specify the other uses for which capacity will be excluded from ATC. This methodology was developed to determine the minimum import transfer capability margin necessary to support ComEd`s planned generation reserve margin and the application of that transfer capability margin to a firm transmission access request. The methodology will establish the level of import transfer capability that must be reserved to supply native load during periods of generation deficiency. To develop the methodology, the summer of 1995 was used as the reference period. The methodology developed uses various programs and sources of data to provide a general guidance for the user on critical information required to determine TRIM. Engineering judgment is required in analyzing the results to arrive at a final determination.

OSTI ID:
376192
Report Number(s):
CONF-960426-; TRN: IM9642%%280
Resource Relation:
Conference: 58. annual meeting of the American power conference, Chicago, IL (United States), 9-11 Apr 1996; Other Information: PBD: 1996; Related Information: Is Part Of Proceedings of the American Power Conference. Volume 58-I; McBride, A.E. [ed.]; PB: 767 p.
Country of Publication:
United States
Language:
English

Similar Records

Forum on ancillary services: Proceedings
Technical Report · Fri Sep 01 00:00:00 EDT 1995 · OSTI ID:376192

Estimated electric demand and supply for summer 1981: contiguous United States. Staff report
Technical Report · Fri May 01 00:00:00 EDT 1981 · OSTI ID:376192

The FERC`s formula for transmission contracts: Using a good concept for the wrong service
Journal Article · Sun Dec 31 00:00:00 EST 1995 · NRRI Quarterly Bulletin · OSTI ID:376192