Title: National Ignition Facility project acquisition plan

The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertial Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.
Authors:
Publication Date:
OSTI Identifier:
251402
Report Number(s):
UCRL-ID--124032; NIF-LLNL--96-251;L--16865-2
ON: DE96011659; TRN: 96:016408
DOE Contract Number:
W-7405-ENG-48
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: Apr 1996
Research Org:
Lawrence Livermore National Lab., CA (United States)
Sponsoring Org:
USDOE, Washington, DC (United States)
Country of Publication:
United States
Language:
English
Subject:
70 PLASMA PHYSICS AND FUSION; ICF DEVICES; PROCUREMENT; PLANNING; INERTIAL CONFINEMENT; PROGRAM MANAGEMENT; COST; SITE SELECTION; SCHEDULES