skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Alignment of components and assembly of 3 MeV electron beam accelerator - a complete solution

Conference ·
; ; ; ; ;  [1]
  1. Accelerator and Pulse Power Division, Bhabha Atomic Research Centre, Mumbai (India)

A 3 MeV, 30 kW DC Electron Beam Accelerator developed at BARC is installed at the Electron Beam Centre (EBC) Kharghar, Navi Mumbai. The entire accelerator assembly, spread over two floors, consists of Electron Gun, Accelerating Tube, Steering Magnet, Focusing Coil, Beam Tube, Beam Locating Aperture, Scan Magnet Chamber and Scan Horn. The complete electron beamline will be maintained under high vacuum of the order of 10{sup -6} mbar. The paper discusses about the present problem of alignment, measurement technique of alignment, reasons for misalignment, ways to solve the problem, detailed alignment procedure and equipment used for alignment work. (author)

Research Organization:
Bhabha Atomic Research Centre, Mumbai (India); Indian Vacuum Society, Mumbai (India)
OSTI ID:
22597192
Resource Relation:
Conference: ISDEIV-2014: 26. international symposium on discharges and electrical insulation in vacuum, Mumbai (India), 28 Sep - 3 Oct 2014; Other Information: Country of input: India; 1 ref., 15 figs.; This record replaces 48041820; Related Information: In: Proceedings of the twenty sixth international symposium on discharges and electrical insulation in vacuum. V. 2| 392 p.
Country of Publication:
United States
Language:
English