Title: Cost estimation of HVDC transmission system of Bangka’s NPP candidates

Regarding nuclear power plant development in Bangka Island, it can be estimated that produced power will be oversupply for the Bangka Island and needs to transmit to Sumatra or Java Island. The distance between the regions or islands causing considerable loss of power in transmission by alternating current, and a wide range of technical and economical issues. The objective of this paper addresses to economics analysis of direct current transmission system to overcome those technical problem. Direct current transmission has a stable characteristic, so that the power delivery from Bangka to Sumatra or Java in a large scale efficiently and reliably can be done. HVDC system costs depend on the power capacity applied to the system and length of the transmission line in addition to other variables that may be different.
Authors:
;  [1]
  1. Centre for Nuclear Energy Development, National Nuclear Energy Agency of Indonesia (Indonesia)
Publication Date:
OSTI Identifier:
22307856
Resource Type:
Journal Article
Resource Relation:
Journal Name: AIP Conference Proceedings; Journal Volume: 1615; Journal Issue: 1; Conference: ICANSE 2013: 4. international conference on advances in nuclear science and engineering, Denpasar, Bali (Indonesia), 16-19 Sep 2013; Other Information: (c) 2014 AIP Publishing LLC; Country of input: International Atomic Energy Agency (IAEA)
Country of Publication:
United States
Language:
English
Subject:
29 ENERGY PLANNING, POLICY AND ECONOMY; ALTERNATING CURRENT; COST ESTIMATION; DIRECT CURRENT; ECONOMIC ANALYSIS; HVDC SYSTEMS; INDONESIA; JAVA; NUCLEAR POWER PLANTS; POWER TRANSMISSION LINES