Cryogenic test of the 4 K / 2 K insert for the ARIEL e-Linac cryomodule
- TRIUMF, 4004 Wesbrook Mall, Vancouver, BC (Canada)
- University of British Columbia, Vancouver (Canada)
- Variable Energy Cyclotron Center, Kolkata (India)
The ARIEL project at TRIUMF requires a 50 MeV superconducting electron linac consisting of five nine cell 1.3 GHz cavities divided into three cryomodules with one, two and two cavities in each module respectively. LHe is distributed in parallel to each module at 4 K and at ∼1.2 bar. Each module has a cryogenic insert on board that receives the 4 K liquid and produces 2 K into a cavity phase separator. The module combines a 4 K phase separator, a plate and fin heat exchanger from DATE and a J-T valve expanding into the 2 K phase separator. The unit also supplies 4 K liquid to thermal intercepts in the module in siphon loops that return the vaporized liquid to the 4 K reservoir. For testing purposes the unit is outfitted with a dummy 2 K phase separator and thermal intercepts with variable heaters that mimic the final heat loads in order to test the cryogenic performance. The design of the 4 K / 2 K insert, the results of the cold tests and a summary of the test infrastructure including cryogenics services will be presented.
- OSTI ID:
- 22262717
- Journal Information:
- AIP Conference Proceedings, Vol. 1573, Issue 1; Conference: Cryogenic engineering conference, Anchorage, AK (United States), 17-21 Jun 2013; Other Information: (c) 2014 AIP Publishing LLC; Country of input: International Atomic Energy Agency (IAEA); ISSN 0094-243X
- Country of Publication:
- United States
- Language:
- English
Similar Records
Results from sudden loss of vacuum on scaled superconducting radio frequency cryomodule experiment
Assessment of thermal loads in the CERN SPS crab cavities cryomodule 1