Title: Visible, Durable, Enforceable Institutional Controls: Weldon Spring Site - A 10-Year Journey - 13190

Conference ·
OSTI ID:22224954
;  [1];  [2]
  1. Stoller LMS Team (United States)
  2. DOE Office of Legacy Management (United States)

The DOE Office of Legacy Management's (LM's) mission is to manage the DOE's post-closure responsibilities and ensure the future protection of human health and the environment. LM has control and custody of legacy land, structures, and facilities and is responsible for maintaining them at levels suitable for their long-term use. This includes all engineered and institutional controls (ICs) designed as another level of assurance to prevent exposure to residual contamination and waste. The development and management of ICs has been, and continues to be, a critical component to the success of LM surveillance and maintenance activities. Many major federal laws, Executive Orders, regulations, and various other drivers influence the establishment and use of ICs at LM sites. LM uses a wide range of ICs to appropriately limit access to, or uses of, land, facilities, and other real and personal properties; protect the environment; maintain the physical safety and security of DOE facilities; and prevent or limit inadvertent human and environmental exposure to residual contaminants and other hazards. The ICs at the Weldon Spring, Missouri, Site were developed in close coordination with federal and state regulators. An Explanation of Significant Differences (ESD) was issued in February 2005, which clarified the use restrictions necessary for the remedial actions specified in the Records of Decision for the separate operable units to remain protective over the long-term. The operable units included the Chemical Plant Operable Unit, the Chemical Plant Groundwater Operable Unit, and the Quarry Residuals Operable Unit. The ESD clarified specific requirements for each site area that needed use restrictions and established how DOE would implement, maintain, and monitor the specific requirements. DOE developed the Long-Term Surveillance and Maintenance Plan for the U.S. Department of Energy Weldon Spring, Missouri, Site (LTS and M Plan) that addressed the full scope of the site management activities necessary to ensure that the Weldon Spring Site remains protective over the long-term. The LTS and M Plan is revised periodically to ensure its applicability to changing site, regulatory, or procedural conditions. In addition to addressing such activities as long-term groundwater monitoring and disposal cell maintenance, the LTS and M Plan was developed and issued to ensure that the use restrictions identified in the ESD were properly imposed and maintained. The LTS and M Plan included a detailed IC Implementation Plan, which includes a process for evaluating and identifying specific IC mechanisms that best accomplish the objectives set out in the ESD. Consistent with EPA guidance on selecting ICs, various IC mechanisms were evaluated, including government controls, proprietary controls, enforcement tools, and informational devices. Where appropriate, redundant mechanisms were employed to increase the effectiveness of the ICs. Information in the IC Implementation Plan includes: (1) a discussion of current site conditions (reflecting post-remedial action conditions for the Chemical Plant and Quarry Areas and the risk-basis for why use restrictions are needed); (2) the objectives of, or performance expectations for, the use restrictions; (3) specific ICs already in place and additional mechanisms identified for implementation; (4) a schedule for implementing additional ICs; (5) procedures for maintaining the ICs and for conducting periodic inspections; and (6) general provisions for the implementing ICs for the site. The actual agreements and documentation of the various ICs are included in an appendix of the LTS and M Plan. These documents are also available via the internet from the authorizing agencies (County, Missouri Department of Natural Resources, EPA, etc.) The Weldon Spring Site personnel have been successful in finalizing each of the ICs that were established for the site. The planning, establishment, and implementation of the ICs was a long and detailed process with several lessons-learned that were identified along the way. (authors)

Research Organization:
WM Symposia, 1628 E. Southern Avenue, Suite 9-332, Tempe, AZ 85282 (United States)
OSTI ID:
22224954
Report Number(s):
INIS-US-13-WM-13190; TRN: US14V0397045909
Resource Relation:
Conference: WM2013: Waste Management Conference: International collaboration and continuous improvement, Phoenix, AZ (United States), 24-28 Feb 2013; Other Information: Country of input: France; 1 refs.