Title: Surveillance of PLUS7{sup TM} fuel for PWR nuclear power plant

Conference ·
OSTI ID:22107864
; ; ; ;  [1]; ; ; ;  [2]
  1. KEPCO Nuclear Fuel KNF, 989beon-gil 242, Daedeok-daero, Yuseong-gu, Daejeon, 305-353 (Korea, Republic of)
  2. Korea Hydro and Nuclear Power Co., Ltd.KHNP, 512 Yeongdongdaero, Kangnam-gu, Seoul, 135-791 (Korea, Republic of)

The surveillance program on the advanced nuclear fuel of PLUS{sup TM} developed for Optimized Power Reactors of 1000 MWe (OPR1000s) and Advanced Power Reactors of 1400 MWe (APR1400s) in Korea was completed in the early of 2011. This fuel had been jointly developed through the extensive out-of-pile tests with Westinghouse for three years since 1999. The irradiation tests for the in-reactor verification using four lead test assemblies (LTAs) had been started in Ulchin unit 3 in 2002. During the overhaul period after each irradiation test, the eight (8) burnup-dependent parameters were measured without disassembling using the precise measurement systems in pool-side. After three cycle irradiations, one test assembly was disassembled and the rod-wise inspection on twenty rods was performed. During this stage, five (5) parameters were measured and evaluated. Among these twenty rods, ten rods including skeleton were sent to hot-cell test facility for further detailed examination and are currently being examined. After in-reactor verifications during two cycles, this fuel was commercially supplied to eight (8) OPR1000s sequentially. Currently all eight (8) OPR1000s were replaced with this fuel. In addition, this fuel is going to be supplied to four (4) APR1400s being constructed in Braka, UAE as well as four(4) OPR1000s and four(4) APR1400s being constructed in Korea. In the meanwhile, the surveillance program for the commercially supplied fuel has been launched to confirm growth, creep, corrosion and deformation, etc. obtained during LTA irradiation. Four (4) limiting fuel assemblies, that is, two (2) assemblies to be discharged after 2 cycle irradiations and the other two (2) after 3 cycle irradiations were selected for this surveillance program. Irradiation data of commercially supplied fuels are compared and confirmed to LTA irradiation performance behaviors on this paper. Among the eight (8) burnup-dependent parameters, the interesting ones were irradiation-induced growths of grid width, rod and assembly lengths while cladding oxide thickness, rod creep and swelling followed the LTA results, and assembly bow/twist and rod bow were well below the design limits. The rod growths were on the lower bound of database and contributed to assembly growth. It was evaluated that these results were attributed to PLUS{sup TM} design characteristics which adopted Inconel top and bottom grids and conformal-shaped mid grid spring. (authors)

Research Organization:
American Nuclear Society, 555 North Kensington Avenue, La Grange Park, IL 60526 (United States)
OSTI ID:
22107864
Resource Relation:
Conference: ICAPP '12: 2012 International Congress on Advances in Nuclear Power Plants, Chicago, IL (United States), 24-28 Jun 2012; Other Information: Country of input: France; 6 refs.; Related Information: In: Proceedings of the 2012 International Congress on Advances in Nuclear Power Plants - ICAPP '12| 2799 p.
Country of Publication:
United States
Language:
English