skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Successful Use of Remote Engineering Technology to Upgrade Electrical Power Supplies to a Plant Producing Vitrified Highly Active Waste

Conference ·
OSTI ID:21294743
 [1]
  1. Nexia Solutions Ltd, Workington, Cumbria CA (United Kingdom)

This paper describes a remote handling intervention project on the Sellafield site in the UK that successfully replaced a critical part of a critical plant in a highly radioactive and contaminated cell. The aim of the project was to replace the existing design of electrical power supplies inside the plant that vitrifies high level liquid waste with a new improved design. The project designed and built a hydraulic manipulator and associated work-heads and tooling to be deployed in cell to remotely replace the power supplies. As part of this replacement process, the project also designed and built a drilling rig to remotely drill holes through the cell wall suitable for the new design of electrical power supplies. (authors)

Research Organization:
WM Symposia, 1628 E. Southern Avenue, Suite 9 - 332, Tempe, AZ 85282 (United States)
OSTI ID:
21294743
Report Number(s):
INIS-US-09-WM-07405; TRN: US10V0275040933
Resource Relation:
Conference: WM'07: 2007 Waste Management Symposium - Global Accomplishments in Environmental and Radioactive Waste Management: Education and Opportunity for the Next Generation of Waste Management Professionals, Tucson, AZ (United States), 25 Feb - 1 Mar 2007; Other Information: Country of input: France
Country of Publication:
United States
Language:
English