Title: Phased Demolition of an Occupied Facility

Conference ·
OSTI ID:21144230
; ; ;  [1]
  1. Bechtel Jacobs Co., LLC, P.O. Box 4699, Oak Ridge, Tennessee 37831 (United States)

The U.S. government constructed the K-1401 facility in the late 1940's as a support building for various projects supporting the uranium gaseous diffusion process. In 2004 the U.S. Department of Energy authorized Bechtel Jacobs Company, LLC (BJC) to decontaminate and demolish the facility. The K-1401 facility was used for a variety of industrial purposes supporting the gaseous diffusion process. Many different substances were used to support these processes over the years and as a result different parts of the facility were contaminated with fluorine, chlorine trifluoride, uranium and technetium radiological contamination, asbestos, and mercury. The total facility area is 46,015 m{sup 2} (495,000 sf) including a 6,800 m{sup 2} basement (73,200 sf). In addition to the contamination areas in the facility, a large portion was leased to businesses for re-industrialization when the D and D activities began. The work scope associated with the facility included purging and steam cleaning the former fluorine and chlorine trifluoride systems, decontaminating loose radiologically contaminated and mercury spill areas, dismantling former radiological lines contaminated with uranium oxide compounds and technetium, abating all asbestos containing material, and demolishing the facility. These various situations contributed to the challenge of successfully conducting D and D tasks on the facility. In order to efficiently utilize the work force, demolition equipment, and waste hauling trucks the normal approach of decontaminating the facility of the hazardous materials, and then conducting demolition in series required a project schedule of five years, which is not cost effective. The entire project was planned with continuous demolition as the goal end state. As a result, the first activities, Phase 1, required to prepare sections for demolition, including steam cleaning fluorine and chlorine trifluoride process lines in basement and facility asbestos abatement, were conducted while the tenants who were leasing floor space in the facility moved out. Upon completion of this phase the facility was turned over to the demolition project and the most hazardous materials were removed from the facility. Phase 2 activities included removing the process gas lines from sections C/D/E while decontaminating and preparing sections A and B for demolition. Demolition preparation activities include removing transit siding and universal waste from the area. Phase 3 began with demolition activities in sections A and B1 while continuing process gas line removal from sections C/D/E, as well as conducting demolition preparation activities to these sections. Area B was split into two sections, allowing demolition activities to occur in section B1 while personnel could still access the upper floor in sections C, D, and E. Once demolition began in section B2, personnel entry was only authorized in the basement. This timeline initiated phase 4, and the project completed cleaning the process components from the basement while section B2 demolition began. The final phase, phase 5, began once the basement was cleared. Final demolition activities began on sections C, D, E, and the basement. This material will ship for disposal and is scheduled for completion during FY07. Because the project was able to successfully phase demolition activities, the total facility demolition schedule was reduced by half to 2-1/2 years. The project was able to move portions of the demolition schedule from working in series to working in parallel, allowing the job to deliver facility demolition debris to ship for disposal 'just in time' as the facility was demolished.

Research Organization:
American Nuclear Society, 555 North Kensington Avenue, La Grange Park, Illinois 60526 (United States)
OSTI ID:
21144230
Resource Relation:
Conference: DD and R 2007: ANS Topical Meeting on Decommissioning, Decontamination, and Reutilization 2007, Chattanooga, TN (United States), 16-19 Sep 2007; Other Information: Country of input: France; Related Information: In: Proceedings of the 2007 ANS Topical Meeting on Decommissioning, Decontamination, and Reutilization - DD and R 2007, 336 pages.
Country of Publication:
United States
Language:
English