Title: Value engineering study report on Lower East Fork Poplar Creek Project. Alternative No. 3

Technical Report ·
OSTI ID:170572

The project under study is Alternative No. 3 as identified in the Feasibility Study dated August 1994. This alternative is identified as Excavation and Disposal of Commercial/DOE, Other, and Residential Remedial Unit Soil. The assumptions used for generating baseline costs are discussed in site associated costs. It is further described as follows: Soils with mercury concentrations greater than 200 ppM in the Commercial/DOE and Other Remedial Units and greater than 180 ppM in the Residential Remedial Unit [41,300m{sup 3} (54,000yd{sup 3} a volume equivalent to approximately 6,750 dump truck loads)] would be excavated and disposed of in an approved, lined landfill at Y-12 with leachate collection and possible pretreatment of the leachate before discharge. Because 0.6 ha (1.5 acres) of wetland would be destroyed, wetlands banking would occur, whereby a 1.8-ha (4.5-acre) wetland would be constructed on DOE-owned land near K-25. Borrow soil would be obtained from the Y-12 West End Borrow Area or from excess soil located at Y-12 landfills to fill the excavation. It is estimated that 7.3 ha (18.2 acres, and area about the size of 17 football fields) of habitat would be adversely affected. This alternative would use BMPs to minimize any adverse affects and to comply substantively with regulatory requirements.

Research Organization:
Oak Ridge Y-12 Plant (Y-12), Oak Ridge, TN (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC05-84OR21400
OSTI ID:
170572
Report Number(s):
Y/ER-237; ON: DE96003712; TRN: 96:003169
Resource Relation:
Other Information: DN: Environmental Restoration Program; PBD: Aug 1995