Title: WESF hot cells waste minimization criteria hot cells window seals evaluation

WESF will decouple from B Plant in the near future. WESF is attempting to minimize the contaminated solid waste in their hot cells and utilize B Plant to receive the waste before decoupling. WESF wishes to determine the minimum amount of contaminated waste that must be removed in order to allow minimum maintenance of the hot cells when they are placed in ''laid-up'' configuration. The remaining waste should not cause unacceptable window seal deterioration for the remaining life of the hot cells. This report investigates and analyzes the seal conditions and hot cell history and concludes that WESF should remove existing point sources, replace cerium window seals in F-Cell and refurbish all leaded windows (except for A-Cell). Work should be accomplished as soon as possible and at least within the next three years.
Authors:
Publication Date:
OSTI Identifier:
16855
Report Number(s):
HNF-SD-E57618-ER-001-REV1; ON: DE98059700; BR: EW7050000
ON: DE98059700; BR: EW7050000; TRN: US0111066
DOE Contract Number:
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 31 Mar 1997; Supercedes report DE98059700; PBD: 31 Mar 1997
Sponsoring Org:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (US)
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; 11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; CERIUM; HOT CELLS; MAINTENANCE; MINIMIZATION; POINT SOURCES; SOLID WASTES; WINDOWS; SEALING MATERIALS; DECOMMISSIONING; RADIOACTIVE WASTE MANAGEMENT