skip to main content

SciTech ConnectSciTech Connect

Title: Yucca Mountain Project: ESF Title I design control process review report

The Exploratory Shaft Facility (ESF) Title 1 Design Control Process Review was initiated in response to direction from the Office of Civilian Radioactive Waste Management (OCRWM) (letter: Kale to Gertz, NRC Concerns on Title 1 Design Control Process, November 17, 1988). The direction was to identify the existing documentation that described ``{hor_ellipsis} the design control process and the quality assurance that governed {hor_ellipsis}`` (a) the development of the requirements documents for the ESF design, (b) the various interfaces between activities, (c) analyses and definitions leading to additional requirements in the System Design Requirements Documents and, (d) completion of Title 1 Design. This report provides historical information for general use in determining the extent of the quality assurance program in existence during the ESF Title 1 Design.
Publication Date:
OSTI Identifier:
138046
Report Number(s):
DOE/NV--91009791
ON: DE91009791; TRN: 91:012967
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 19 Jan 1989
Research Org:
USDOE Nevada Operations Office, Las Vegas, NV (United States). Yucca Mountain Project Office
Sponsoring Org:
USDOE, Washington, DC (USA)
Country of Publication:
United States
Language:
English
Subject:
05 NUCLEAR FUELS; YUCCA MOUNTAIN; RADIOACTIVE WASTE DISPOSAL; SHAFT EXCAVATIONS; DESIGN; QUALITY ASSURANCE; DOCUMENTATION; CONTROL; TESTING; DECISION MAKING; Yucca Mountain Project