Analysis of Operating Strategies Using Different Target Designs For 238Pu Production
- University of Tennessee (UT)
- ORNL
An engineering effort is underway to re-establish capability to produce 238Pu oxide at the kilogram scale in the United States. A multi-step batch process is being developed to produce this important material. Recently, a portion of this process was studied using discrete-event simulation tools to determine whether the conceptual process might achieve its yearly production goal. The study showed the conceptual process can meet the yearly production goal under some circumstances, but process improvements would be needed to ensure greater likelihood of success. This study extends the work performed previously by examining the effects of changing the reactor target design on the yearly process output. Two new reactor target configurations are considered an aluminum-clad reactor target containing 50% greater 237Np oxide content than the original target, and a zirconium alloy-clad target using no aluminum. The results indicate that use of the new aluminum-clad target configuration may allow the process to achieve the same yearly production goal in less time using fewer targets. If the zirconium alloy-clad target is used, then even fewer targets would be needed to reach the production goal, but some process changes would be required to handle the zirconium cladding. The number of days needed to process a target batch to completion, and the steady state 238Pu oxide production rate, for each configuration are compared to the results from the initial simulation study.
- Research Organization:
- Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)
- Sponsoring Organization:
- Work for Others (WFO)
- DOE Contract Number:
- AC05-00OR22725
- OSTI ID:
- 1348338
- Resource Relation:
- Conference: Nuclear and Emerging Technologies for Space 2017, Orlando, FL, USA, 20170227, 20170304
- Country of Publication:
- United States
- Language:
- English
Similar Records
EVALUATION OF AN ENGINEERING DEMONSTRATION OF THE MODIFIED ZIRFLEX AND NEUFLEX PROCESSES FOR THE PREPARATION OF SOLVENT EXTRACTION FEEDS FROM UNIRRADIATED ZIRCONIUM-BASE REACTOR FUELS
Preconceptual Feasibility Study to Evaluate Alternative Means to Produce Plutonium-238