PIC Simulations in Low Energy Part of PIP-II Proton Linac
The front end of PIP-II linac is composed of a 30 keV ion source, low energy beam transport line (LEBT), 2.1 MeV radio frequency quadrupole (RFQ), and medium energy beam transport line (MEBT). This configuration is currently being assembled at Fermilab to support a complete systems test. The front end represents the primary technical risk with PIP-II, and so this step will validate the concept and demonstrate that the hardware can meet the specified requirements. SC accelerating cavities right after MEBT require high quality and well defined beam after RFQ to avoid excessive particle losses. In this paper we will present recent progress of beam dynamic study, using CST PIC simulation code, to investigate partial neutralization effect in LEBT, halo and tail formation in RFQ, total emittance growth and beam losses along low energy part of the linac.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1304765
- Report Number(s):
- FERMILAB-CONF-14-126-TD; 1314313
- Resource Relation:
- Conference: 5th International Particle Accelerator Conference, Dresden, Germany, 06/16-06/20/2014
- Country of Publication:
- United States
- Language:
- English
Similar Records
Experimental Study of Beam Dynamics in the PIP-II MEBT Prototype
Design of PIP-II Medium Energy Beam Transport