skip to main content

Title: Progress Towards Doubling the Beam Power at Fermilab's Accelerator Complex

After a 16 month shutdown to reconfigure the Fermilab Accelerators for high power operations, the Fermilab Accelerator Complex is again providing beams for numerous Physics Experiments. By using the Recycler to slip stack protons while the Main Injector is ramping, the beam power at 120 GeV can reach 700 KW, a factor of 2 increase. The progress towards doubling the Fermilab's Accelerator complex beam power will be presented.
Authors:
 [1]
  1. Fermilab
Publication Date:
OSTI Identifier:
1296919
Report Number(s):
FERMILAB-CONF-14-187-AD
1314160
DOE Contract Number:
AC02-07CH11359
Resource Type:
Conference
Resource Relation:
Conference: 5th International Particle Accelerator Conference, Dresden, Germany, 06/16-06/20/2014
Research Org:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
Sponsoring Org:
USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
Country of Publication:
United States
Language:
English
Subject:
43 PARTICLE ACCELERATORS