Design, operations planning and experience from the marine operations for the Europipe jacket with bucket foundations
Conference
·
OSTI ID:128952
- Statoil A/S, Stavanger (Norway)
The Europipe 16/11-E riser platform was successfully installed in the Norwegian part of the North Sea last summer. Rather than having the traditional piled foundations, the platform has bucket foundations consisting of one inverted 12m diameter bucket in each of the four Jacket corners. After set down of the Jacket on the seabed and self weight penetration, the Jacket legs were waterfilled and the buckets thus gained further penetration. Finally suction within the buckets penetrated them to target penetration. This paper describes the preparatory work and the installation of the structure, discusses the main problem areas and experiences gained from the installation.
- OSTI ID:
- 128952
- Report Number(s):
- CONF-950501-; TRN: IM9550%%338
- Resource Relation:
- Conference: 27. offshore technology conference, Houston, TX (United States), 1-4 May 1995; Other Information: PBD: 1995; Related Information: Is Part Of 27. Annual Offshore Technology Conference: 1995 Proceedings. Volume 2: Platform and marine system design; PB: 986 p.
- Country of Publication:
- United States
- Language:
- English
Similar Records
Geotechnical experience from the installation of the Europipe jacket with bucket foundations
Development and structural design of the bucket foundations for the Europipe jacket
Geotechnical design of bucket foundations
Conference
·
Fri Dec 01 00:00:00 EST 1995
·
OSTI ID:128952
Development and structural design of the bucket foundations for the Europipe jacket
Conference
·
Fri Dec 01 00:00:00 EST 1995
·
OSTI ID:128952
Geotechnical design of bucket foundations
Conference
·
Fri Dec 01 00:00:00 EST 1995
·
OSTI ID:128952
+1 more