skip to main content

SciTech ConnectSciTech Connect

Title: System Study: Emergency Power System 1998–2013

This report presents an unreliability evaluation of the emergency power system (EPS) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2013 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10-year period, while yearly estimates for system unreliability are provided for the entire active period. No statistically significant trends were identified in the EPS results.
Authors:
 [1]
  1. Idaho National Lab. (INL), Idaho Falls, ID (United States). Risk Assessment and Management Services Dept.
Publication Date:
OSTI Identifier:
1261722
Report Number(s):
INL/EXT--15-34441
TRN: US1601596
DOE Contract Number:
AC07-05ID14517; NRC-HQ-14-D-0018
Resource Type:
Technical Report
Research Org:
Idaho National Lab. (INL), Idaho Falls, ID (United States)
Sponsoring Org:
USDOE; US Nuclear Regulatory Commission (NRC)
Country of Publication:
United States
Language:
English
Subject:
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; POWER SUPPLIES; NUCLEAR POWER PLANTS; ACCIDENTS; DEMAND; EVALUATION; FAILURES; RELIABILITY commercial nuclear reactor; emergency power system; operating experience; unreliability