Title: Proposed Risk-Informed Seismic Hazard Periodic Reevaluation Methodology for Complying with DOE Order 420.1C

Technical Report ·
DOI:https://doi.org/10.2172/1261041· OSTI ID:1261041
 [1]
  1. Idaho National Lab. (INL), Idaho Falls, ID (United States)

Department of Energy (DOE) nuclear facilities must comply with DOE Order 420.1C Facility Safety, which requires that all such facilities review their natural phenomena hazards (NPH) assessments no less frequently than every ten years. The Order points the reader to Standard DOE-STD-1020-2012. In addition to providing a discussion of the applicable evaluation criteria, the Standard references other documents, including ANSI/ANS-2.29-2008 and NUREG-2117. These documents provide supporting criteria and approaches for evaluating the need to update an existing probabilistic seismic hazard analysis (PSHA). All of the documents are consistent at a high level regarding the general conceptual criteria that should be considered. However, none of the documents provides step-by-step detailed guidance on the required or recommended approach for evaluating the significance of new information and determining whether or not an existing PSHA should be updated. Further, all of the conceptual approaches and criteria given in these documents deal with changes that may have occurred in the knowledge base that might impact the inputs to the PSHA, the calculated hazard itself, or the technical basis for the hazard inputs. Given that the DOE Order is aimed at achieving and assuring the safety of nuclear facilities—which is a function not only of the level of the seismic hazard but also the capacity of the facility to withstand vibratory ground motions—the inclusion of risk information in the evaluation process would appear to be both prudent and in line with the objectives of the Order. The purpose of this white paper is to describe a risk-informed methodology for evaluating the need for an update of an existing PSHA consistent with the DOE Order. While the development of the proposed methodology was undertaken as a result of assessments for specific SDC-3 facilities at Idaho National Laboratory (INL), and it is expected that the application at INL will provide a demonstration of the methodology, there is potential for general applicability to other facilities across the DOE complex. As such, both a general methodology and a specific approach intended for INL are described in this document. The general methodology proposed in this white paper is referred to as the “seismic hazard periodic review methodology,” or SHPRM. It presents a graded approach for SDC-3, SDC-4 and SDC-5 facilities that can be applied in any risk-informed regulatory environment once risk-objectives appropriate for the framework are developed. While the methodology was developed for seismic hazard considerations, it can also be directly applied to other types of natural hazards.

Research Organization:
Idaho National Lab. (INL), Idaho Falls, ID (United States)
Sponsoring Organization:
USDOE Office of Nuclear Energy (NE)
DOE Contract Number:
AC07-05ID14517
OSTI ID:
1261041
Report Number(s):
INL/EXT-15-36510 (Revision 1); INL/EXT-15-36510 (Revision 1); TRN: US1601571
Country of Publication:
United States
Language:
English