skip to main content

Title: Test of a 250 kVA Battery-Inverter System Micro-Grid: Cooperative Research and Development Final Report, CRADA Number CRD-11-460

Portland General Electric (PGE) is installing a 5-megawatt (MW) lithium-ion-based battery-inverter system (BIS) in Salem, Oregon, as part of the Pacific Northwest Smart Grid Demonstration Project. NREL will assist PGE in testing a 250-kilovolt-ampere (kVA) portion of the BIS in order to verify correct operation and minimize risk to subsequent demonstrations. In this project NREL will providetechnical support for the 250-kVA test and will work with PGE to write a test plan and evaluate the system in the lab before deployment in the field.
Authors:
 [1] ;  [1] ;  [1]
  1. National Renewable Energy Lab. (NREL), Golden, CO (United States)
Publication Date:
OSTI Identifier:
1260891
Report Number(s):
NREL/TP--7A10-58889
DOE Contract Number:
AC36-08GO28308
Resource Type:
Technical Report
Research Org:
National Renewable Energy Lab. (NREL), Golden, CO (United States)
Sponsoring Org:
USDOE
Country of Publication:
United States
Language:
English
Subject:
29 ENERGY PLANNING, POLICY, AND ECONOMY; 32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION CRADAS; lithium ion-based battery-inverter system; battery; inverter; smart grid demonstration project; Pacific Northwest Smart Grid; microgrid; faults