Contingency Contractor Optimization Phase 3 Sustainment Requirements Document Contingency Contractor Optimization Tool - Prototype
- Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)
This requirements document serves as an addendum to the Contingency Contractor Optimization Phase 2, Requirements Document [1] and Phase 3 Requirements Document [2]. The Phase 2 Requirements document focused on the high-level requirements for the tool. The Phase 3 Requirements document provided more detailed requirements to which the engineering prototype was built in Phase 3. This document will provide detailed requirements for features and enhancements being added to the production pilot in the Phase 3 Sustainment.
- Research Organization:
- Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Sandia National Laboratories.,
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC04-94AL85000
- OSTI ID:
- 1254275
- Report Number(s):
- SAND2016-4694; 640352
- Country of Publication:
- United States
- Language:
- English
Similar Records
Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype
Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype
Contingency Contractor Optimization Phase 3 Sustainment Verification and Validation V&V) Report - Contingency Contractor Optimization Engineering - Prototype
Technical Report
·
Wed Jun 01 00:00:00 EDT 2016
·
OSTI ID:1254275
+2 more
Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype
Technical Report
·
Sun May 01 00:00:00 EDT 2016
·
OSTI ID:1254275
+1 more
Contingency Contractor Optimization Phase 3 Sustainment Verification and Validation V&V) Report - Contingency Contractor Optimization Engineering - Prototype
Technical Report
·
Fri Apr 01 00:00:00 EDT 2016
·
OSTI ID:1254275
+4 more