skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Contingency Contractor Optimization Phase 3 Sustainment Requirements Document Contingency Contractor Optimization Tool - Prototype

Technical Report ·
DOI:https://doi.org/10.2172/1254275· OSTI ID:1254275

This requirements document serves as an addendum to the Contingency Contractor Optimization Phase 2, Requirements Document [1] and Phase 3 Requirements Document [2]. The Phase 2 Requirements document focused on the high-level requirements for the tool. The Phase 3 Requirements document provided more detailed requirements to which the engineering prototype was built in Phase 3. This document will provide detailed requirements for features and enhancements being added to the production pilot in the Phase 3 Sustainment.

Research Organization:
Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Sandia National Laboratories.,
Sponsoring Organization:
USDOE
DOE Contract Number:
AC04-94AL85000
OSTI ID:
1254275
Report Number(s):
SAND2016-4694; 640352
Country of Publication:
United States
Language:
English