skip to main content

Title: Cost Consideration and a Possible Construction Timeline of the CEPC-SPPC

This paper discusses the cost consideration and a possible construction timeline of the CEPC-SPPC study based on a preliminary conceptual design that is being carried out at the Institute of High Energy Physics (IHEP) in China.
Authors:
 [1]
  1. Fermilab
Publication Date:
OSTI Identifier:
1251179
Report Number(s):
FERMILAB-CONF-14-577-AD; arXiv:1510.09191
1374685
DOE Contract Number:
AC02-07CH11359
Resource Type:
Conference
Resource Relation:
Conference: 55th ICFA Advanced Beam Dynamics Workshop on High Luminosity Circular e+e- Colliders – Higgs Factory, Beijing, China, 10/09-10/12/2014
Research Org:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
Sponsoring Org:
USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
Country of Publication:
United States
Language:
English
Subject:
43 PARTICLE ACCELERATORS