skip to main content

SciTech ConnectSciTech Connect

Title: Installation Status of the Electron Beam Profiler for the Fermilab Main Injector

The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging and often depends on non-invasive techniques. One such technique involves measuring the deflection of a probe beam of electrons with a trajectory perpendicular to the proton beam. A device such as this is already in use at the Spallation Neutron Source at ORNL and the installation of a similar device is underway in the Main Injector at Fermilab. The present installation status of the electron beam profiler for the Main Injector will be discussed together with some simulations and test stand results.
Authors:
; ; ; ; ; ; ;
Publication Date:
OSTI Identifier:
1250502
Report Number(s):
FERMILAB-CONF-15-409-AD; arXiv:1511.02132
1403215
DOE Contract Number:
AC02-07CH11359
Resource Type:
Conference
Research Org:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
Sponsoring Org:
USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
Country of Publication:
United States
Language:
English
Subject:
43 PARTICLE ACCELERATORS