skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Interstate Electrification Improvement Project

Technical Report ·
DOI:https://doi.org/10.2172/1234444· OSTI ID:1234444
 [1];  [1]
  1. Shorepower Technologies, Hillsboro, OR (United States)

The Interstate Electrification Improvement Project, publicly known as the Shorepower Truck Electrification Project (STEP), started in May 2011 and ended in March 2015. The project grant was awarded by the Department of Energy’s Vehicles Technology Office in the amount of $22.2 million. It had three overarching missions: 1. Reduce the idling of Class 8 tractors when parked at truck stops, to reduce diesel fuel consumption and thus U.S. dependence on foreign petroleum; 2. Stimulate job creation and economic activity as part of the American Reinvestment and Recovery Act of 2009; 3. Reduce greenhouse gas emissions (GHG) from diesel combustion and the carbon footprint of the truck transportation industry. The project design was straightforward. First, build fifty Truck Stop Electrification (TSE) facilities in truck stop parking lots across the country so trucks could plug-in to 110V, 220V, or 480VAC, and shut down the engine instead of idling. These facilities were strategically located at fifty truck stops along major U.S. Interstates with heavy truck traffic. Approximately 1,350 connection points were installed, including 150 high-voltage electric standby Transport Refrigeration Unit (eTRU) plugs--eTRUs are capable of plugging in to shore power1 to cool the refrigerated trailer for loads such as produce, meats and ice cream. Second, the project provided financial incentives on idle reduction equipment to 5,000 trucks in the form of rebates, to install equipment compatible with shore power. This equipment enables drivers to shut down the main engine when parked, to heat or cool their cab, charge batteries, or use other household appliances without idling—a common practice that uses approximately 1 gallon of diesel per hour. The rebate recipients were intended to be the first fleets to plug into Shorepower to save diesel fuel and ensure there is significant population of shore power capable trucks. This two part project was designed to complement each other by providing: 1) the infrastructure to plug into and 2) the on-board equipment capable of plugging into the infrastructure. This project generated the largest dataset to date on shore power TSE utilization and use patterns, providing: insight into driver behavior and acceptance; evidence of cost savings; experience with system operations and management; and data for guiding future development of shore power, whether as a private enterprise or a publicly-subsidized service for meeting air quality goals.

Research Organization:
Shorepower Technologies, Hillsboro, OR (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
EE0002613
OSTI ID:
1234444
Country of Publication:
United States
Language:
English

Similar Records

Idling Reduction for Long-Haul Trucks: An Economic Comparison of On-Board and Wayside Technologies
Technical Report · Thu Sep 01 00:00:00 EDT 2016 · OSTI ID:1234444

Truckstop -- and Truck!-- Electrification
Conference · Thu Dec 13 00:00:00 EST 2001 · OSTI ID:1234444

Shorepower Truck Electrification Project (STEP) - 1Q - 2Q 2013
Program Document · Sat Feb 01 00:00:00 EST 2014 · OSTI ID:1234444