skip to main content

SciTech ConnectSciTech Connect

Title: HPC - Facilities Penta

Strategy, Planning, Acquiring- very large scale computing require very large physical infrastructures, pipes, pumps, power, etc. Planning and acquiring $25M+ infrastructure projects and bringing in more power to the county takes a lot of long lead time / planning. Integration- New physical infrastructure must be integrated into our buildings, with the LANL site power and water systems, with existing infrastructure, and with the machines. Very large physical infrastructure projects are necessary. Management and Utilization – Ongoing operations, monitoring, maintenance, and trouble shooting of the physical infrastructure is required.
Authors:
 [1]
  1. Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
Publication Date:
OSTI Identifier:
1223175
Report Number(s):
LA-UR--15-27870
DOE Contract Number:
AC52-06NA25396
Resource Type:
Technical Report
Research Org:
Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
Sponsoring Org:
USDOE
Country of Publication:
United States
Language:
English
Subject:
Mathematics & Computing(97) Computer Hardware