skip to main content

Title: The International Linear Collider Progress Report 2015

The ILC technical design is now being adapted to the preferred candidate site. Changes in layout are being managed by a rigorous change-control procedure. Series production of cavities for the European XFEL has shown that cavities can be mass-produced in industry with a performance well above XFEL requirements and close to that needed for the ILC. A number of technical developments are under way with a view to further reducing the ILC cost. This work must continue through the preparatory stage for ILC construction once resources become available. A summary of the design updates and of the further preparatory work needed is summarized in tabular form in the Appendix.
Authors:
 [1]
  1. SLAC National Accelerator Lab., Menlo Park, CA (United States)
Publication Date:
OSTI Identifier:
1213169
Report Number(s):
SLAC-R--1056
DOE Contract Number:
AC02-76SF00515
Resource Type:
Technical Report
Research Org:
SLAC National Accelerator Lab., Menlo Park, CA (United States)
Sponsoring Org:
USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
Country of Publication:
United States
Language:
English