Title: Preliminary Development of a Work Breakdown Structure (WBS) for Small Modular Reactors (SMRs)

In summary, this preliminary WBS serves as an initial basis for the capital cost component of the economic analysis of SMRs. This preliminary WBS comes from the known WBS for existing, large nuclear power plants and develops the methodology for accounting for the anticipated differences between the current large plants and the projected SMR designs.