skip to main content

Title: A number of upgrades on RHIC power supply system

This year marks the 15th run for the Relativistic Heavy Ion Collider (RHIC). Operation of a reliable superconducting magnet power supply system is a key factor of an accelerator’s performance. Over the past 15 years, the RHIC power supply group has made many improvements to increase the machine availability and reduce failures. During these past 15 years of operating RHIC a lot of problems have been solved or addressed. In this paper some of the essential upgrades/improvements are discussed.
Authors:
 [1] ;  [1] ;  [1] ;  [1] ;  [1] ;  [1] ;  [1] ;  [1] ;  [1] ;  [1] ;  [1]
  1. Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.
Publication Date:
OSTI Identifier:
1188236
Report Number(s):
BNL--107435-2015-CP
R&D Project: KBCH139; 18037; KB0202011; TRN: US1500245
DOE Contract Number:
SC00112704
Resource Type:
Conference
Resource Relation:
Conference: 6th International Particle Accelerator Conference (IPAC’15), Richmond, VA (United States), 3-8 May 2015
Research Org:
Brookhaven National Laboratory (BNL), Upton, NY (United States)
Sponsoring Org:
USDOE Office of Science (SC), Nuclear Physics (NP) (SC-26)
Country of Publication:
United States
Language:
English
Subject:
43 PARTICLE ACCELERATORS; BROOKHAVEN RHIC; AVAILABILITY; SUPERCONDUCTING MAGNETS; PERFORMANCE; POWER SUPPLIES; MODIFICATIONS