skip to main content

Title: Design and test of the RHIC CMD10 abort kicker

In recent RHIC operational runs, planned and unplanned pre-fire triggered beam aborts have been observed that resulted in quenches of SC main ring magnets, indicating a weakened magnet kick strength due to beam-induced ferrite heating. An improvement program was initiated to reduce the longitudinal coupling impedance with changes to the ferrite material and the eddy-current strip geometry. Results of the impedance measurements and of magnet heating tests with CMD10 ferrite up to 190°C are reported. All 10 abort kickers in the tunnel have been modified and were provided with a cooling system for the RUN 15.
Authors:
 [1] ;  [1] ;  [1] ;  [1] ;  [1] ;  [1] ;  [1] ;  [1] ;  [1] ;  [1] ;  [1] ;  [1]
  1. Brookhaven National Lab. (BNL), Upton, NY (United States)
Publication Date:
OSTI Identifier:
1183846
Report Number(s):
BNL--107217-2015-CP
R&D Project: KBCH139; KB0202011; TRN: US1500214
DOE Contract Number:
SC00112704
Resource Type:
Conference
Resource Relation:
Conference: 6th International Particle Accelerator Conference (IPAC’15), Richmond, VA (United States), 3-8 May 2015
Research Org:
Brookhaven National Laboratory (BNL), Upton, NY (United States)
Sponsoring Org:
USDOE Office of Science (SC), Nuclear Physics (NP) (SC-26)
Country of Publication:
United States
Language:
English
Subject:
43 PARTICLE ACCELERATORS; KICKER MAGNETS; BROOKHAVEN RHIC; FERRITES; COOLING SYSTEMS; PERFORMANCE; DESIGN; TESTING; HEATING; ELECTRIC IMPEDANCE; COUPLING