Design and test of the RHIC CMD10 abort kicker
Conference
·
OSTI ID:1183846
- Brookhaven National Lab. (BNL), Upton, NY (United States)
In recent RHIC operational runs, planned and unplanned pre-fire triggered beam aborts have been observed that resulted in quenches of SC main ring magnets, indicating a weakened magnet kick strength due to beam-induced ferrite heating. An improvement program was initiated to reduce the longitudinal coupling impedance with changes to the ferrite material and the eddy-current strip geometry. Results of the impedance measurements and of magnet heating tests with CMD10 ferrite up to 190°C are reported. All 10 abort kickers in the tunnel have been modified and were provided with a cooling system for the RUN 15.
- Research Organization:
- Brookhaven National Lab. (BNL), Upton, NY (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), Nuclear Physics (NP)
- DOE Contract Number:
- SC00112704
- OSTI ID:
- 1183846
- Report Number(s):
- BNL-107217-2015-CP; R&D Project: KBCH139; KB0202011; TRN: US1500214
- Resource Relation:
- Conference: 6th International Particle Accelerator Conference (IPAC’15), Richmond, VA (United States), 3-8 May 2015
- Country of Publication:
- United States
- Language:
- English
Similar Records
AN ENGINEERING SOLUTION TO THE RHIC BEAM ABORT KICKER UPGRADE.
RHIC ABORT KICKER WITH REDUCED COUPLING IMPEDANCE.
Measurement and simulation of the RHIC abort kicker longitudinal impedence
Conference
·
Sun May 23 00:00:00 EDT 2004
·
OSTI ID:1183846
RHIC ABORT KICKER WITH REDUCED COUPLING IMPEDANCE.
Conference
·
Sun Jun 02 00:00:00 EDT 2002
·
OSTI ID:1183846
Measurement and simulation of the RHIC abort kicker longitudinal impedence
Technical Report
·
Tue Sep 01 00:00:00 EDT 2009
·
OSTI ID:1183846