Title: Distributed Dynamic State Estimator, Generator Parameter Estimation and Stability Monitoring Demonstration

Technical Report ·
DOI:https://doi.org/10.2172/1176943· OSTI ID:1176943
 [1];  [1];  [2];  [3]
  1. Georgia Inst. of Technology, Atlanta, GA (United States)
  2. New York Power Authority, NY (United States)
  3. U.S. Virgin Islands Water and Power Authority (WAPA), St. Croix (U.S. Virgin Islands)

This is the final report for this project that was performed in the period: October1, 2009 to June 30, 2013. In this project, a fully distributed high-fidelity dynamic state estimator (DSE) that continuously tracks the real time dynamic model of a wide area system with update rates better than 60 times per second is achieved. The proposed technology is based on GPS-synchronized measurements but also utilizes data from all available Intelligent Electronic Devices in the system (numerical relays, digital fault recorders, digital meters, etc.). The distributed state estimator provides the real time model of the system not only the voltage phasors. The proposed system provides the infrastructure for a variety of applications and two very important applications (a) a high fidelity generating unit parameters estimation and (b) an energy function based transient stability monitoring of a wide area electric power system with predictive capability. Also the dynamic distributed state estimation results are stored (the storage scheme includes data and coincidental model) enabling an automatic reconstruction and “play back” of a system wide disturbance. This approach enables complete play back capability with fidelity equal to that of real time with the advantage of “playing back” at a user selected speed. The proposed technologies were developed and tested in the lab during the first 18 months of the project and then demonstrated on two actual systems, the USVI Water and Power Administration system and the New York Power Authority’s Blenheim-Gilboa pumped hydro plant in the last 18 months of the project. The four main thrusts of this project, mentioned above, are extremely important to the industry. The DSE with the achieved update rates (more than 60 times per second) provides a superior solution to the “grid visibility” question. The generator parameter identification method fills an important and practical need of the industry. The “energy function” based transient stability monitoring opens up new ways to protect the power grid, better manage disturbances, confine their impact and in general improve the reliability and security of the system. Finally, as a by-product of the proposed research project, the developed system is able to “play back” disturbances by a click of a mouse. The importance of this by-product is evident by considering the tremendous effort exerted after the August 2003 blackout to piece together all the disturbance recordings, align them and recreate the sequence of events. This project has moved the state of art from fault recording by individual devices to system wide disturbance recording with “play back” capability.

Research Organization:
Georgia Institute of Technology, Atlanta, GA (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
OE0000117
OSTI ID:
1176943
Country of Publication:
United States
Language:
English

Similar Records

A Hybrid-Learning Algorithm for Online Dynamic State Estimation in Multimachine Power Systems
Journal Article · Thu Feb 13 00:00:00 EST 2020 · IEEE Transactions on Neural Networks and Learning Systems · OSTI ID:1176943

Using an operator training simulator in the undergraduate chemical engineering curriculim
Conference · Sun Jan 01 00:00:00 EST 2012 · OSTI ID:1176943

Formulation of Three-Phase State Estimation Problem Using a Virtual Reference
Journal Article · Mon Jun 22 00:00:00 EDT 2020 · IEEE Transactions on Power Systems · OSTI ID:1176943