skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Operator interface for vehicles

Patent ·
OSTI ID:1172142

A control interface for drivetrain braking provided by a regenerative brake and a non-regenerative brake is implemented using a combination of switches and graphic interface elements. The control interface comprises a control system for allocating drivetrain braking effort between the regenerative brake and the non-regenerative brake, a first operator actuated control for enabling operation of the drivetrain braking, and a second operator actuated control for selecting a target braking effort for drivetrain braking. A graphic display displays to an operator the selected target braking effort and can be used to further display actual braking effort achieved by drivetrain braking.

Research Organization:
International Truck Intellectual Property Company, LLC, Lisle, IL (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
EE0003303
Assignee:
International Truck Intellectual Property Company, LLC (Lisle, IL)
Patent Number(s):
8,977,418
Application Number:
13/978,766
OSTI ID:
1172142
Resource Relation:
Patent File Date: 2011 Feb 16
Country of Publication:
United States
Language:
English

References (6)

Coordinated regenerative and engine retard braking for a hybrid vehicle patent November 2006
Engine retard operation scheduling and management in a hybrid vehicle patent January 2007
Service brake control system for optimized regenerative braking of medium or heavy trucks patent November 2011
Process for controlling a start-stop operation of a vehicle having a hybrid drive, and a corresponding vehicle patent December 2012
Torque control for hybrid electric vehicle speed control operation patent December 2013
Process for controlling a start-stop operation of a vehicle having a hybrid drive, and a corresponding vehicle patent July 2014

Similar Records

Phase I Report: DARPA Exoskeleton Program
Technical Report · Wed Jan 21 00:00:00 EST 2004 · OSTI ID:1172142

The overview in safety review of human factors engineering and control room design in chinese AP1000 nuclear power plant - 174
Conference · Thu Jun 15 00:00:00 EDT 2017 · OSTI ID:1172142

Commercial Building Technology Demonstration (Final Scientific/Technical Report)
Technical Report · Tue Aug 13 00:00:00 EDT 2019 · OSTI ID:1172142