skip to main content

SciTech ConnectSciTech Connect

Title: Springfield Processing Plant* (A Hypothetical Facility) SPP, Entry Control Point and Vehicle Gate Access Control Post Order

This hypothetical order provides the requirements and instructions for the Springfield Processing Plant (SPP) Vehicle Gate and Entry Control Point (ECP) in the perimeter access building. The purpose of this post is to prevent the theft, sabotage or diversion of nuclear material (NM), control access and exit at the protected area, and to respond to emergencies according the SPP Guard Force (GF) Contingency Plan and as directed by a Guard Force Supervisor.
Authors:
 [1]
  1. Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)
Publication Date:
OSTI Identifier:
1171446
Report Number(s):
SAND2014-15373R
534030
DOE Contract Number:
AC04-94AL85000
Resource Type:
Technical Report
Research Org:
Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)
Sponsoring Org:
USDOE National Nuclear Security Administration (NNSA)
Country of Publication:
United States
Language:
English