skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Investigations of the output energy deviation and other parameters during commissioning of the four-rod radio frequency quadrupole at the Fermi National Accelerator Laboratory

Journal Article · · Physical Review Special Topics - Accelerators and Beams

After 30 years of operation, the Cockcroft-Walton based injector at FNAL (Fermi National Accelerator Laboratory) has been replaced by a new beam line including a dimpled magnetron 35 keV source in combination with a 750 keV 4-rod Radio Frequency Quadrupole (RFQ). The new injector is followed by the existing drift tube linac (DTL). Prior to installation, a test beam line was built which included the magnetron source and the 4-rod RFQ with a number of beam measurement instrumentation. The first beam test with the RFQ showed an output energy deviation greater than 2.5%. Other problems also showed up which led to investigations of the output energy, power consumption and transmission properties using RF simulations which were complemented with additional beam measurements. The sources of this deviation and the mechanical modifications of the RFQ to solve this matter will be presented in this paper. Meanwhile, the nominal output energy of 750 keV has been confirmed and the new injector with the 4-rod RFQ is in full operation.

Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1151739
Report Number(s):
FERMILAB-PUB-14-095-AD; PRABFM; ArticleNumber: 030102
Journal Information:
Physical Review Special Topics - Accelerators and Beams, Vol. 17, Issue 3; ISSN 1098-4402
Country of Publication:
United States
Language:
English

References (3)

RF Linear Accelerators book January 2008
Design of the heavy-ion injector PIAVE conference January 1999
SILHI proton beam (80mA–95keV) characteristics as a function of the beam line atmosphere at CEA/saclay journal January 2001

Similar Records

The FNAL injector upgrade
Conference · Tue Mar 01 00:00:00 EST 2011 · OSTI ID:1151739

Installation and commissioning of the new Fermi National Accelerator Laboratory H- Magnetron
Journal Article · Sat Feb 15 00:00:00 EST 2014 · Review of Scientific Instruments · OSTI ID:1151739

Commissioning and Operation of the FNAL Front end Injection Line and Ion Sources.
Thesis/Dissertation · Tue Sep 01 00:00:00 EDT 2015 · OSTI ID:1151739

Related Subjects