Title: Screening evaluation of radionuclide groundwater concentrations for the end state basement fill model Zion Nuclear Power Station decommissioning project

ZionSolutions is in the process of decommissioning the Zion Nuclear Power Plant. The site contains two reactor Containment Buildings, a Fuel Building, an Auxiliary Building, and a Turbine Building that may be contaminated. The current decommissioning plan involves removing all above grade structures to a depth of 3 feet below grade. The remaining underground structures will be backfilled with clean material. The final selection of fill material has not been made.
Authors:
Publication Date:
OSTI Identifier:
1143602
Report Number(s):
BNL--105443-2014-IR
R&D Project: 87270/87271; 600301010
DOE Contract Number:
DE-AC02-98CH10886
Resource Type:
Technical Report
Research Org:
Brookhaven National Laboratory (BNL)
Sponsoring Org:
USDOE SC OFFICE OF SCIENCE (SC)
Country of Publication:
United States
Language:
English
Subject:
54 ENVIRONMENTAL SCIENCES