skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Linac cryogenic distribution system maintenance and upgrades at Jlab

Conference · · AIP Conf. Proc.
DOI:https://doi.org/10.1063/1.4860799· OSTI ID:1132613

The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

Research Organization:
Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)
Sponsoring Organization:
USDOE Office of Science (SC)
DOE Contract Number:
AC05-06OR23177
OSTI ID:
1132613
Report Number(s):
JLAB-ACE-13-1783; DOE/OR/23177-2993
Journal Information:
AIP Conf. Proc., Vol. 1573; Conference: ADVANCES IN CRYOGENIC ENGINEERING: Transactions of the Cryogenic Engineering Conference - CEC, 17–21 June 2013, Anchorage, Alaska
Country of Publication:
United States
Language:
English

Similar Records

Linac cryogenic distribution system maintenance and upgrades at JLab
Journal Article · Wed Jan 29 00:00:00 EST 2014 · AIP Conference Proceedings · OSTI ID:1132613

OVERVIEW AND STATUS OF THE 12 GeV CRYOGENIC SYSTEM UPGRADE AT JLAB
Journal Article · Fri Apr 09 00:00:00 EDT 2010 · AIP Conference Proceedings · OSTI ID:1132613

Overview and Status of the 12 GeV Cryogenic System Upgrade At Jlab
Conference · Thu Apr 01 00:00:00 EDT 2010 · AIP Conference Proceedings · OSTI ID:1132613