skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Assessment of Energy Storage Alternatives in the Puget Sound Energy System

Technical Report ·
DOI:https://doi.org/10.2172/1114900· OSTI ID:1114900
 [1];  [1];  [1];  [2];  [3];  [4]
  1. Pacific Northwest National Lab. (PNNL), Richland, WA (United States)
  2. Puget Sound Energy, Bellevue, WA (United States)
  3. Puget Sound Energy, Bellevue, WA (United States)
  4. Primus Power, Hayward, CA (United States)

As part of an ongoing study co-funded by the Bonneville Power Administration, under its Technology Innovation Grant Program, and the U.S. Department of Energy, the Pacific Northwest National Laboratory (PNNL) has developed an approach and modeling tool for assessing the net benefits of using energy storage located close to the customer in the distribution grid to manage demand. PNNL in collaboration with PSE and Primus Power has evaluated the net benefits of placing a zinc bromide battery system at two locations in the PSE system (Baker River / Rockport and Bainbridge Island). Energy storage can provide a number of benefits to the utility through the increased flexibility it provides to the grid system. Applications evaluated in the assessment include capacity value, balancing services, arbitrage, distribution deferral and outage mitigation. This report outlines the methodology developed for this study and Phase I results.

Research Organization:
Pacific Northwest National Lab. (PNNL), Richland, WA (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC05-76RL01830
OSTI ID:
1114900
Report Number(s):
PNNL-23040; 600306000
Country of Publication:
United States
Language:
English