skip to main content

Title: A Bunch Length Monitor for JLab 12 GeV Upgrade

A continuous non-invasive bunch length monitor for the 12 GeV upgrade of Jefferson Lab will be used to determine the bunch length of the beam. The measurement will be done at the fourth dipole of the injector chicane at 123 MeV using the coherent synchrotron light emitted from the dipole. The estimated bunch length is 333 fs. A vacuum chamber will be fabricated and a Radiabeam real time interferometer will be used. In this paper, background, the estimated calculations and the construction of the chamber will be discussed.
Authors:
 [1] ;  [2] ;  [2] ;  [2]
  1. ODU
  2. JLAB
Publication Date:
OSTI Identifier:
1113533
Report Number(s):
JLAB-ACC-13-1742; DOE/OR/23177-2869
DOE Contract Number:
AC05-06OR23177
Resource Type:
Conference
Resource Relation:
Conference: North American Particle Accelerator Conference (PAC13) , 29 Sep - 4 Oct 2013. Pasadena, CA
Research Org:
Thomas Jefferson National Accelerator Facility, Newport News, VA (United States)
Sponsoring Org:
USDOE Office of Science (SC)
Country of Publication:
United States
Language:
English
Subject:
43 PARTICLE ACCELERATORS