skip to main content

SciTech ConnectSciTech Connect

Title: INTEGRATED SCIENCE BUILDING

Shell space fit out included faculty office advising space, student study space, staff restroom and lobby cafe. Electrical, HVAC and fire alarm installations and upgrades to existing systems were required to support the newly configured spaces. These installations and upgrades included audio/visual equipment, additional electrical outlets and connections to emergency generators. The project provided increased chilled water capacity with the addition of an electric centrifugal chiller. Upgrades associated with chiller included upgrade of exhaust ventilation fan, electrical conductor and breaker upgrades, piping and upgrades to air handling equipment.
Authors:
 [1]
  1. DIRECTOR OF ADMIN
Publication Date:
OSTI Identifier:
1098242
Report Number(s):
ISB - FTS-1
S1190000000034
DOE Contract Number:
SC0006792
Resource Type:
Technical Report
Research Org:
UMASS AMHERST
Sponsoring Org:
USDOE Office of Science (SC)
Country of Publication:
United States
Language:
English
Subject:
99 GENERAL AND MISCELLANEOUS