skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: FUSION NUCLEAR SCIENCE FACILITY (FNSF) BEFORE UPGRADE TO COMPONENT TEST FACILITY (CTF)

Journal Article · · Fusion Science and Technology
DOI:https://doi.org/10.13182/FST60-441· OSTI ID:1081812

The compact (R0~1.2-1.3m) Fusion Nuclear Science Facility (FNSF) is aimed at providing a fully integrated, continuously driven fusion nuclear environment of copious fusion neutrons. This facility would be used to test, discover, and understand the complex challenges of fusion plasma material interactions, nuclear material interactions, tritium fuel management, and power extraction. Such a facility properly designed would provide, initially at the JET-level plasma pressure (~30%T2) and conditions (e.g., Hot-Ion H-Mode, Q<1)), an outboard fusion neutron flux of 0.25 MW/m2 while requiring a fusion power of ~19 MW. If and when this research is successful, its performance can be extended to 1 MW/m2 and ~76 MW by reaching for twice the JET plasma pressure and Q. High-safety factor q and moderate-plasmas are used to minimize or eliminate plasma-induced disruptions, to deliver reliably a neutron fluence of 1 MW-yr/m2 and a duty factor of 10% presently anticipated for the FNS research. Success of this research will depend on achieving time-efficient installation and replacement of all internal components using remote handling (RH). This in turn requires modular designs for the internal components, including the single-turn toroidal field coil center-post. These device goals would further dictate placement of support structures and vacuum weld seals behind the internal and shielding components. If these goals could be achieved, the FNSF would further provide a ready upgrade path to the Component Test Facility (CTF), which would aim to test, for 6 MW-yr/m2 and 30% duty cycle, the demanding fusion nuclear engineering and technologies for DEMO. This FNSF-CTF would thereby complement the ITER Program, and support and help mitigate the risks of an aggressive world fusion DEMO R&D Program. The key physics and technology research needed in the next decade to manage the potential risks of this FNSF are identified.

Research Organization:
Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)
Sponsoring Organization:
USDOE Office of Science (SC)
DOE Contract Number:
DE-AC05-00OR22725
OSTI ID:
1081812
Journal Information:
Fusion Science and Technology, Vol. 60, Issue 2; ISSN 1536-1055
Publisher:
American Nuclear Society
Country of Publication:
United States
Language:
English

Similar Records

Fusion Nuclear Science Facility (FNSF) before Upgrade to Component Test Facility (CTF)
Conference · Fri Jan 01 00:00:00 EST 2010 · OSTI ID:1081812

Fusion Nuclear Schience Facility-AT: A Material And Component Testing Device
Journal Article · Sun Jul 01 00:00:00 EDT 2012 · Fusion Science and Technology, 62(1):283-288 · OSTI ID:1081812

Physics and technology considerations for the deuterium–tritium fuel cycle and conditions for tritium fuel self sufficiency
Journal Article · Mon Nov 23 00:00:00 EST 2020 · Nuclear Fusion · OSTI ID:1081812

Related Subjects