skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Final Focus Test Facility ATF2 Status

Journal Article · · ICFA Beam Dynamics Newsletter
OSTI ID:1038024

ATF2 is a final-focus test beam line which aims to focus the low emittance beam from the ATF damping ring to a vertical size of about 37 nm and to demonstrate nanometre level beam stability. Several advanced beam diagnostics and feedback tools are used. In December 2008, construction and installation were completed and beam commissioning started, supported by an international team of Asian, European and American scientists. In this paper, the present status and performance of the recently deployed ATF2 systems are briefly described, based on the first experience with beam measurements and tuning during winter, spring and early autumn of 2009. The near and longer term plans are outlined as well. The ATF collaboration has completed the construction of ATF2 and has started its commissioning. Important experience operating the new cavity BPM and BSM instrumentation in real conditions has been gained and first beam measurements have been performed in a magnetic configuration with reduced optical demagnification. Both horizontal and vertical emittances were successfully tuned and measured in the extraction line, with values approaching the design values of 2 nm and 12 pm, respectively. First checks of the first order optics along the beam line and at the IP were also done. Hardware developments for the second ATF2 goal are being pursued in parallel with the present commissioning work for the first goal. The collaboration is also preparing several near and long terms plans for ATF2. In the next few years, information very valuable for any future collider with local chromaticity correction and tuning of very low emittance beams can be expected. In the previous experience at the FFTB, the smallest vertical beam sizes which were achieved were about 70 nanometers. The work described here continues to address this largely unexplored regime in a systematic way.

Research Organization:
SLAC National Accelerator Lab., Menlo Park, CA (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-76SF00515
OSTI ID:
1038024
Report Number(s):
SLAC-REPRINT-2012-009; TRN: US201208%%152
Journal Information:
ICFA Beam Dynamics Newsletter, Journal Issue: 50
Country of Publication:
United States
Language:
English

Similar Records

ATF2 Summary and Status
Journal Article · Thu Apr 19 00:00:00 EDT 2012 · ICFA Beam Dynamics Newsletter · OSTI ID:1038024

ATF2 Commissioning
Conference · Fri Oct 30 00:00:00 EDT 2009 · OSTI ID:1038024

Development of Electronics for the ATF2 Interaction Point Region Beam Position Monitor
Conference · Tue Aug 14 00:00:00 EDT 2012 · Conf.Proc.C100523:MOPE035,2010 · OSTI ID:1038024