Commissioning of the Ground Test Accelerator RFQ
The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H{sup {minus}} beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 key H{sup {minus}} injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2{beta}{gamma} Drift Tube Linac (DTL-1) module, the 8.7 MeV 2{beta}{gamma} DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the RFQ beam experiments will be presented along with comparisons to simulations.
- Research Organization:
- Los Alamos National Lab., NM (United States)
- Sponsoring Organization:
- Department of Defense, Washington, DC (United States)
- DOE Contract Number:
- W-7405-ENG-36
- OSTI ID:
- 10173928
- Report Number(s):
- LA-UR-92-2703; CONF-9208109-14; ON: DE92040242
- Resource Relation:
- Conference: 16. international LINAC conference,Ottawa (Canada),23-28 Aug 1992; Other Information: PBD: [1992]
- Country of Publication:
- United States
- Language:
- English
Similar Records
Commissioning of the Ground Test Accelerator Intertank Matching Section
Commissioning of the Ground Test Accelerator Intertank Matching Section