skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Muon g-2 Superconducting Magnet Commissioning Preparation

Abstract

A time-lapse of the Fermilab muon g-2 ring being installed and prepped, from June 27, 2014 to June 5, 2015.

Publication Date:
Research Org.:
FNAL (Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States))
Sponsoring Org.:
USDOE
OSTI Identifier:
1189895
Resource Type:
Multimedia
Country of Publication:
United States
Language:
English
Subject:
42 ENGINEERING; MUON G-2; SUPERCONDUCTING; MAGNET; TIMELAPSE; MUON; MC-1

Citation Formats

None. Muon g-2 Superconducting Magnet Commissioning Preparation. United States: N. p., 2015. Web.
None. Muon g-2 Superconducting Magnet Commissioning Preparation. United States.
None. Fri . "Muon g-2 Superconducting Magnet Commissioning Preparation". United States. https://www.osti.gov/servlets/purl/1189895.
@article{osti_1189895,
title = {Muon g-2 Superconducting Magnet Commissioning Preparation},
author = {None},
abstractNote = {A time-lapse of the Fermilab muon g-2 ring being installed and prepped, from June 27, 2014 to June 5, 2015.},
doi = {},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2015},
month = {6}
}

Multimedia:

Save / Share:
Save to Playlist
You must Sign In or Create an Account in order to save documents to your library.