skip to main content

Title: Full Length time lapse, 1.5 MW wind turbine installation at the National Renewable Energy Laboratory

This is a full version of a time lapse taken on Aug. 21 when a 1.5 megawatt wind turbine was installed at NREL's National Wind Technology Center. (There is no sound with this video.)
Title: Full Length time lapse, 1.5 MW wind turbine installation at the National Renewable Energy Laboratory
Publication Date: 2009-01-01
OSTI Identifier: 1048081
Resource Type: Multimedia
Research Org: National Renewable Energy Lab. (NREL), Golden, CO (United States)
Sponsoring Org: USDOE
Subject: 99 GENERAL AND MISCELLANEOUS ; 13 HYDRO ENERGY ; NREL ; Wind ; Turbine ; 1.5 ; megawatt ; technology ; National ; Renewable ; Energy ; Laboratory ; clean ; electricity
Country of Publication: United States
Language: English
Run Time: 0:01:54
System Entry Date: 2016-01-27