Title: Technological developments and accelerator improvements for the FRIB beam power ramp-up

Journal Article · · Journal of Instrumentation
ORCiD logo [1]; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; more »; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; « less
  1. Michigan State University, East Lansing, MI (United States); et al.; Facility for Rare Isotope Beams, Michigan State University

The Facility for Rare Isotope Beams (FRIB) began operation with 1 kW beam power for scientific users in May 2022 upon completion of 8 years of project construction. The ramp-up to the ultimate beam power of 400 kW, planned over a 6-year period, will enable the facility to reach its full potential for scientific discovery in isotope science and applications. In December 2023, a record-high beam power of 10.4 kW uranium was delivered to the target. Technological developments and accelerator improvements are being made over the entire facility and are key to completion of the power ramp-up. Major technological developments entail the phased deployment of high-power beam-intercepting systems, including the charge strippers, the charge selection systems, the production target, and the beam dump, along with support systems, including non-conventional utilities (NCU) and remote handling facilities. Major accelerator improvements include renovations to aging legacy systems associated with experimental beam lines and system automation for improved operational efficiency and better machine availability. Experience must be gained to safely handle the increased radiological impacts associated with high beam power; extensive machine studies and advanced beam tuning procedures are needed to minimize uncontrolled beam losses for the desired operating conditions. This paper discusses the technological developments and accelerator improvements with emphasis on major R&D efforts.

Research Organization:
Michigan State University, East Lansing, MI (United States)
Sponsoring Organization:
USDOE Office of Science (SC), Nuclear Physics (NP)
Grant/Contract Number:
SC0023633
OSTI ID:
2406262
Journal Information:
Journal of Instrumentation, Journal Name: Journal of Instrumentation Journal Issue: 05 Vol. 19; ISSN 1748-0221
Publisher:
Institute of Physics (IOP)Copyright Statement
Country of Publication:
United States
Language:
English

References (32)

A simple two-dimensional PPAC
  • Swan, D.; Yurkon, J.; Morrissey, D. J.
  • Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, Vol. 348, Issue 2-3 https://doi.org/10.1016/0168-9002(94)90753-6
journal September 1994
Thermo-mechanical behaviour of a single slice test device for the FRIB high power target
  • Pellemoine, F.; Mittig, W.; Avilov, M.
  • Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, Vol. 655, Issue 1 https://doi.org/10.1016/j.nima.2011.06.010
journal November 2011
LISE++: Radioactive beam production with in-flight separators journal October 2008
Design of the Advanced Rare Isotope Separator ARIS at FRIB journal December 2013
Thermal, mechanical and fluid flow aspects of the high power beam dump for FRIB journal June 2016
Commissioning of the Advanced Rare Isotope Separator ARIS at FRIB journal July 2023
LISE cute++, the latest generation of the LISE ++ package, to simulate rare isotope production with fragment-separators journal August 2023
Optimal Design and Operation of Helium Refrigeration Systems Using the Ganni Cycle conference January 2010
Low energy beam transport for facility for rare isotope beams driver linear particle accelerator journal February 2012
Development and status of the FRIB 28 GHz SC ECRIS journal April 2022
Measurements of secondary scintillation in low-pressure CF 4 with a SiPM, from a parallel-plate avalanche geometry journal April 2016
Development of a parallel-plate avalanche counter with optical readout (O-PPAC) journal October 2018
Design, fabrication, and installation of the cryogenic distribution system for FRIB target and fragment pre-separator superconducting magnets journal May 2022
FRIB helium refrigeration system commissioning and performance test results journal March 2020
Efficient continuous wave accelerating structure for ion beams journal April 2020
First Simultaneous Acceleration of Multiple Charge States of Heavy Ion Beams in a Large-Scale Superconducting Linear Accelerator journal March 2021
Experimental Demonstration of the Thin-Film Liquid-Metal Jet as a Charge Stripper journal May 2022
A Heavy-Ion Single-Event Effects Test Facility at Michigan State University conference July 2022
Overview of Fragment Separator Superconducting Magnets in the Facility for Rare Isotope Beams journal August 2023
Design of Coil-Dominated Quadrupole Triplet for High Rigidity Isotope Beams journal August 2023
Design and Development of a 28 GHz Nb$_{{\text{3}}}$Sn ECR Ion Source Superconducting Magnet journal August 2024
Analysis and Management of Thermal Energy Release During Quench in a Superconducting Magnet conference October 2022
Accelerator commissioning and rare isotope identification at the Facility for Rare Isotope Beams journal March 2022
FRIB from Commissioning to Operation conferencepaper January 2024
FRIB Beam Power Ramp-up: Status and Plans conferencepaper January 2024
Automation of RF and Cryomodule Operation at FRIB text January 2022
Status of Gas Sheet Monitor for Profile Measurements at FRIB conferencepaper January 2023
Beam tomography with coupling using maximum entropy technique text January 2023
Completion of FRIB Superconducting Linac and Phased Beam Commissioning text January 2022
Automation of FRIB SRF Cavities and SC Solenoids Turn-on/off text January 2023
FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives text January 2023
Investigation of Plasma Processing for Coaxial Resonators text January 2023