High intensity operation using proton stacking in the Fermilab Recycler to deliver 700 kW of 120 GeV proton beam
Journal Article
·
· Physical Review Accelerators and Beams
Not Available
- Sponsoring Organization:
- USDOE
- Grant/Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1735777
- Alternate ID(s):
- OSTI ID: 1778672
- Journal Information:
- Physical Review Accelerators and Beams, Journal Name: Physical Review Accelerators and Beams Journal Issue: 12 Vol. 23; ISSN 2469-9888; ISSN PRABCJ
- Publisher:
- American Physical SocietyCopyright Statement
- Country of Publication:
- United States
- Language:
- English
Fermilab main injector: High intensity operation and beam loss control
|
journal | July 2013 |
Fast instability caused by electron cloud in combined function magnets
|
journal | April 2017 |
The NuMI neutrino beam
|
journal | January 2016 |
Fermilab Recycler Ring BPM Upgrade Based on Digital Receiver Technology
|
conference | January 2004 |
Commissioning and first results of the Fermilab Muon Campus
|
journal | January 2019 |
Coupled-beam and coupled-bunch instabilities
|
journal | November 2018 |
A new slip stacking RF system for a twofold power upgrade of Fermilab׳s Accelerator Complex
|
journal | September 2014 |
Recent operation of the FNAL magnetron H− ion source
|
conference | January 2017 |
High intensity space charge effects on slip stacked beam in the Fermilab Recycler
|
journal | February 2019 |
Similar Records
High Intensity Proton Stacking at Fermilab: 700 kW Running
High Intensity Proton Stacking at Fermilab: 700 kW Running [Slides]
Reuse Recycler: High Intensity Proton Stacking at Fermilab
Conference
·
2018
·
OSTI ID:1463617
+6 more
High Intensity Proton Stacking at Fermilab: 700 kW Running [Slides]
Technical Report
·
2018
·
OSTI ID:1460779
Reuse Recycler: High Intensity Proton Stacking at Fermilab
Conference
·
2016
·
OSTI ID:1342774