TracSim: Simulating and scheduling trapped power capacity to maximize machine room throughput
- Authors:
- Publication Date:
- Sponsoring Org.:
- USDOE
- OSTI Identifier:
- 1380037
- Grant/Contract Number:
- AC52-06NA25396
- Resource Type:
- Publisher's Accepted Manuscript
- Journal Name:
- Parallel Computing
- Additional Journal Information:
- Journal Name: Parallel Computing Journal Volume: 57 Journal Issue: C; Journal ID: ISSN 0167-8191
- Publisher:
- Elsevier
- Country of Publication:
- Netherlands
- Language:
- English
Citation Formats
Zhang, Ziming, Lang, Michael, Pakin, Scott, and Fu, Song. TracSim: Simulating and scheduling trapped power capacity to maximize machine room throughput. Netherlands: N. p., 2016.
Web. doi:10.1016/j.parco.2015.11.002.
Zhang, Ziming, Lang, Michael, Pakin, Scott, & Fu, Song. TracSim: Simulating and scheduling trapped power capacity to maximize machine room throughput. Netherlands. https://doi.org/10.1016/j.parco.2015.11.002
Zhang, Ziming, Lang, Michael, Pakin, Scott, and Fu, Song. Thu .
"TracSim: Simulating and scheduling trapped power capacity to maximize machine room throughput". Netherlands. https://doi.org/10.1016/j.parco.2015.11.002.
@article{osti_1380037,
title = {TracSim: Simulating and scheduling trapped power capacity to maximize machine room throughput},
author = {Zhang, Ziming and Lang, Michael and Pakin, Scott and Fu, Song},
abstractNote = {},
doi = {10.1016/j.parco.2015.11.002},
journal = {Parallel Computing},
number = C,
volume = 57,
place = {Netherlands},
year = {Thu Sep 01 00:00:00 EDT 2016},
month = {Thu Sep 01 00:00:00 EDT 2016}
}
Free Publicly Available Full Text
Publisher's Version of Record
https://doi.org/10.1016/j.parco.2015.11.002
https://doi.org/10.1016/j.parco.2015.11.002
Other availability
Cited by: 2 works
Citation information provided by
Web of Science
Web of Science
Save to My Library
You must Sign In or Create an Account in order to save documents to your library.