Table 1. Fuel Reprocessed at NFS West Valley

Table 1. Fuel Reprocessed at NFS West Valley

Lot No Fuel Source Reactor Name Process Date Received [Note b] Recovered [Note c] kg Pu
MTU[Note d] kg Pu
2 Atomic Energy Commission N-Reactor 4-22-66 19.7 1.7 1.2
1 5-20-66 28.8 2.3 2.5
3 7-15-66 46.7 50.9 50.2
4 Commonwealth Edison Dresden-1 11-12-66 50.0 191.0 182.2
5 Yankee Atomic Electric Yankee Rowe 6-7-67 49.8 285.1 [Note e] 278.6
6 Atomic Energy Commission N-Reactor 9-2-67 26.6 52.6 50.4
7 12-2-67 26.1 47.4 46.9
8 1-6-68 42.4 75.4 77.0
9 5-5-68 38.8 79.1 78.0
10 6-29-68 55.3 115.7 114.4
11 Consolidated Edison [Note f] Indian Point-1 11-15-68 1.1 - -
12 Atomic Energy Commission N-Reactor 2-13-69 48.9 102.5 90.2
13 Yankee Atomic Electric Yankee Rowe 5-14-69 19.6 176.0 171.6
14 Atomic Energy Commission [Note g] N-Reactor 8-16-69 30.3 - -
15 Commonwealth Edison Dresden-1 10-1-69 21.5 104.6 102.3
16 Consolidated Edison Indian Point-1 11-23-69 15.6 107.6 104.2
17 Yankee Atomic Electric Yankee Rowe 6-2-70 9.3 95.6 91.5
18 Northern States Power Pathfinder 8-14-70 9.6 7.1 7.0
19 Consumers Power Big Rock Point 11-26-70 18.4 72.8 72.7
20 Consolidated Edison Indian Point-1 1-11-71 7.6 68.1 63.0
21 Atomic Energy Commission N-Reactor 2-25-71 15.8 25.4 22.8
22 Puerto Rico Water Resources Authority Bonus Superheater [Note h] 4-15-71 1.7 0.9 6.5
Bonus Boiler [Note i] 4-18-71 2.4 4.0
23 Pacific Gas and Electric Humbolt Bay 5-20-71 20.8 87.2 86.0
24 Yankee Atomic Electric Yankee Rowe 7-16-71 9.5 95.7 91.0
25 Carolinas-Virginia Nuclear Power Associates CVTR-PARR 10-4-71 3.5 11.6 11.8
26 Consumers Power Big Rock Point 11-30-71 5.8 27.9 28.4
27 Nuclear Fuels Services, Erwin, Tennessee [Note j] SEFOR 12-12-71 0.1 95.5 95.2
Total 625.7 1983.7 1925.6

Notes

b. The difference between the received and recovered amounts are due to measurement uncertainty of reactor calculations, process holdup, and normal operating losses/measured discards.

c. The 0.1 kg difference between Table 1 and Table 2 for N-Reactor plutonium is due to rounding.

d. Metric Tons Uranium

e. The Nuclear Fuel Services Inc., Safety Analysis Report - NFS' Reprocessing Plant, West Valley, New York, Docket No. 50-201, 1973, showed 185.1 kg - which was probably a typographical error.

f. The fuel in Lot 11 from Indian Point-1 consisted of highly enriched uranium and thorium but contained no plutonium.

g. The fuel in Lot 14 from N-Reactor was unirradiated and therefore contained no plutonium.

h. Bonus Superheater and Bonus Boiler were parts of an experimental reactor.

i. Ibid.

j. The material from Nuclear Fuels Services, Erwin, Tennessee was in the form of liquid residues generated during the fabrication of reactor fuel for the Southwest Experimental Fast Oxide Reactor (SEFOR).