Title:
INTERIM REPORT GENERAL ELECTRIC PROJECT - CONSULTANT AGREEMENT CA-264
Subject Terms:
FUELS AND MATERIALS ENGINEERINGMETALLURGYURANIUM (ZR ALLOY CLAD) - MACHININGURANIUM - ETCHING
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Publication Date:
1961 Jan 30
Declassification Date:
1994 Apr 19
Declassification Status:
Declassified
Accession Number:
RL-1-382708
Document Number(s):
HW-USCM-3
Originating Research Org.:
INCOMING: Author Off Site
OpenNet Entry Date:
2004 Feb 24
OpenNet Modified Date:
2015 Jul 17
Description/Abstract:
THE EFFECTS OF TEMPERATURE AND SOLUTION COMPOSITION ON THE ETCHING OF U FROM A ZRY-2 CLAD TUBE WERE STUDIED. DETAILS OF METHOD OF ANALYSIS OF U ETCHANT 4-1 ARE GIVEN