Title:
PUREX CANYON BLOCK BAIL REINFORCEMENT
Subject Terms:
EQUIPMENTPUREX PROCESS
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Publication Date:
1958 Jan 24
Declassification Date:
1997 Jan 01
Declassification Status:
Declassified
Accession Number:
RL-1-366733
Document Number(s):
HW-54643
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Feb 24
OpenNet Modified Date:
2015 Jul 17
Description/Abstract:
A STUDY OF EXISTING CONDITIONS, BASIC DESIGN CONSIDERATIONS, STRUCTURAL ANALYSIS, CAUSES OF FAILURE, AND MEANS OF CORRECTION OF THESE CAUSES. A REPAIR METHOD CONSISTING OF REINFORCING THE PRESENTLY INSTALLED BAILS AND INTERIM MEASURES FOR LESSENING RISK FACTORS UNTIL REINFORCEMENT IS ACCOMPLISHED ARE PRESENTED. COST ESTIMATES ARE INCLUDED.