Document Details


PURL
Title:
NOZZLE PRESSURE REQUIRED TO FLUSH REGULAR AND I amp;E SLUGS OUT OF BDF, C AND K PROCESS TUBES
Author(s):
Subject Terms:
100 Area - All Reactors100 AreasFuel HandlingHANFORD PRODUCTION REACTORSUNLOADING
Document Location:
DOE Public Reading Room - Hanford Battelle P.O. Box 999 MS H2-53 Richland WA 99352 (509)372-7443
Document Type:
REPORT
Publication Date:
1957 Dec 09
Declassification Date:
1981 Aug 06
Declassification Status:
Declassified
Document Pages:
6
Accession Number:
RL-1-366587
Document Number(s):
HW-54093
Originating Research Org.:
GE - HAPO
OpenNet Entry Date:
2004 Feb 24
OpenNet Modified Date:
2015 Jun 12
Description/Abstract:
REPORTS THE RESULTS OF FLUSHING TEST RUN IN THE 189-D FLOW MOCK-UP TO DETERMINE THE FROM NOZZLE PRESSURES REQUIRED TO FLUSH REGULAR METAL AND I&E SLUG IN 3 TYPES OF PROCESS TUBES WITH THE REAR NOZZLE CAP OFF.


<< Return to Search Results